Auger & Post Hole Digging in Tucson, AZ

An auger drills round holes fast and in a straight line, which suits fence posts, ramada and pole-barn footings, solar piers and light poles. In Tucson, the real question is what the bit hits: sand, gravel, caliche or rock.

Digging post holes by hand in desert soil is slow, and in caliche it can be close to impossible. A machine-driven auger turns that into a repeatable job: set the hole location, drill to the depth, clear the spoil, and move to the next one.

This page covers the structures an auger suits, how we work in Tucson-area ground, and what you need to provide. The size and depth of each hole come from your plans or your engineer, not from us.

What can an auger drill for?

Anything that needs a round hole. On residential and rural properties, that is mostly fences, gates and shade structures. On commercial and agricultural sites it adds light poles, signs and equipment supports.

  • Fence lines: wood, metal and pipe-and-cable fences for yards and pastures, laid out along a string line.
  • Ramadas, carports and pole barns: footings for posts that carry a roof, sized per the plans or the manufacturer.
  • Solar ground-mount piers: holes for racking footings on acreage, often in long rows. See solar and EV trenching for the cable runs that go with them.
  • Light pole and sign bases: larger holes, usually to an engineered detail, for commercial lots and entrances.
  • Trees and shrubs: planting holes where the ground is too hard for a shovel.

Sizes and depths come from your plans, your engineer or the structure's manufacturer. We drill to those dimensions and never guess them for you.

How do we drill in caliche and rock?

Slowly, with the right bit. Caliche is a cemented soil layer formed by calcium carbonate, and it can stop an ordinary auger cold. A rock auger with carbide teeth, a lighter pass followed by a second pass, or a breaker to open the hole first are the usual tools.

Solid rock is a different problem. Sometimes it is faster to break the rock with a hydraulic breaker and clean out the hole, and sometimes the footing design needs to change. If the ground may be hard, we recommend a test hole before committing to a full scope. Our caliche guide and caliche and rock excavation page explain what to expect.

Loose sand and gravel carry the opposite risk: the hole walls can slump before the post goes in. In that case, we set the post or the form soon after drilling.

Which machine runs the auger?

Usually a skid steer or a compact track loader with an auger attachment. It is fast, it moves between holes easily and it works across open ground. For a long fence or a field of piers, it is the efficient choice. See skid steer services.

In tighter spots, a mini excavator with an auger drive can reach where a skid steer cannot, for example along a block wall or in a backyard behind a narrow gate. See mini excavator services. For very large or deep holes, a bigger machine or a drill rig may be required, and we will say so.

Auger size matters too. A narrow bit makes a clean fence-post hole, and a wide one makes a pole footing. We match the bit to the plan.

What should I check before drilling?

Underground lines first. Arizona requires a locate request at least two full working days before digging, and excavators are required to white-line the area. Post holes are digging, so the rule applies even for a fence. The marks last 15 working days, and anything within 24 inches of a marked line is exposed by hand.

Check the rules for the structure too. A pole barn, a shade structure or a tall fence may need a permit or an inspection in your jurisdiction, and footings may need to be inspected before concrete. Your jurisdiction will tell you what applies.

What happens to the dirt and the holes?

Each hole produces a small pile of spoil, and a long fence line produces a lot of them. We can scatter it, pile it for backfill, load it out or leave it where you want it. Say which at the start, because it changes the cleanup.

Holes for concrete are left clean and open for the setting crew, and we can mark depths with the string line. For tree holes, we scarify the sides so that roots can leave the hole. A planting hole that holds water for more than 24 hours suggests caliche below, and drilling extra drainage holes or breaking through is the fix.

If your project also needs digging, grading or a pad, see excavation and grading, or send photos for a quote that covers everything.

What’s included

  • Arizona 811 locate request and white-lining for our work
  • Auger sized to the plan, on a skid steer or mini excavator
  • Holes laid out from your stakes or string line
  • Spoil spread, piled or hauled as agreed
  • Cleanup of the work area

Questions we get about this

How deep and wide are post holes for a fence or ramada?

That depends on the structure, the plans and your jurisdiction, not on a general rule. Fence posts, shade-structure posts and pole-barn footings each have different requirements. Give us the dimensions from your plans or engineer, and we will drill to them.

Can you drill post holes in caliche?

Usually yes, with a rock auger, a slower pass or a hydraulic breaker to open the hole. Very hard layers take more time and can change the quote. A test hole early on shows how hard the ground is, so you can plan the job before committing to every hole.

Do I need to call 811 for fence post holes?

Yes. Digging post holes counts as excavation. Arizona requires a locate request at least two full working days ahead, and excavators must white-line the area. A homeowner digging on their own single-family property is exempt from white-lining but not from the need to find lines. We handle the request for our work.

Can an auger be used for solar ground-mount piers?

Yes, where the array design calls for drilled footings. The auger drills to the depth and diameter in the plan, usually in rows. Some designs use driven piles instead. Check the racking plans and tell us which type applies, and we will coordinate with your installer.

Will you haul away the dirt from the holes?

We can. The spoil can be spread nearby, piled for backfill or loaded and hauled off. A long fence or a solar field produces a lot of dirt, so decide what you want early. Haul-off with dump trucks is available, and it affects how we quote.

Get a quote for auger & post hole digging

Tell us what you need and send a few photos. Photos of the route, the access and the ground let us price most jobs without a site visit.

Photos (optional · up to 3 · 7 MB total)
Best way to reach you

We use your details only to answer this request. See our privacy policy.