Tucson & Southern Arizona Residential & commercial ROC #312437 (KA) · ROC #329360 (KB-1) Call (520) 525-2755

Excavation

Foundation & Footing Excavation in Tucson, AZ

We dig footings and foundations to the depth and width on your plans, working from the surveyor's or builder's stakes, and we leave the trench clean and ready for the footing inspection before the pour.

A footing trench is a small excavation with a big job. It has to be square, level at the bottom and sized to the plan, because the concrete will take the shape of whatever we leave. A rounded corner or a soft spot at the bottom shows up later as a cracked wall.

We dig footings for new homes, additions, detached garages, casitas and block or retaining walls, in open lots and in backyards reached through a narrow gate. Here is how we do it and what we need from you.

How do we dig footings to your plans?

The plans give the footing depth, width and layout. The surveyor or builder stakes the corners and offsets. We dig to those stakes and check the depth and width as we go, trimming the sides and bottom by hand where needed so the trench matches the drawing and not the machine's bucket.

Footing depth is set by the plans and the engineer, and the soils report may add conditions. We do not choose the depth ourselves. If a stake looks wrong, or the ground is not what the report describes, we stop and call you before cutting further.

Bucket width matters. A trenching bucket cuts a clean, narrow trench for continuous footings, and a wider bucket suits a spread footing or pier pad. Where the footing meets a corner or steps down to a lower grade, we shape the step to the plan.

What is over-excavation and when is it needed?

Collapsible soils, which are loose, dry and low-density, settle when they get wet or carry weight. Expansive clays shrink and swell. For this reason, soils reports for Tucson-area lots often call for removing the loose soil under a footing or slab and replacing it with compacted fill, known as over-excavation and recompaction.

We dig to the depth and extent in the report, then compact the fill in lifts so it supports the structure evenly. Third-party compaction testing, where the plans call for it, is scheduled with us on site. The building pads page covers pad work in more detail, and the excavation overview lists the other digs we handle.

What do we do when we hit caliche at footing depth?

Caliche is a cemented soil layer, and it often sits right where a footing wants to go. A cemented layer can be a good bearing surface, but only your engineer can say so. If it shows up, we tell you, and we do not assume anything.

To cut through it, we use a rock bucket, ripper tooth or hydraulic breaker, and finish the sides and bottom so the footing form fits. See caliche and rock excavation and the caliche guide for what to expect. Broken caliche is not a good backfill against a footing wall, so we separate it from the clean fill.

Can you dig footings in a tight backyard?

Often, yes. The smallest compact excavators typically fit through gates around 3 feet wide, and many through 4 feet. Measure your narrowest gate, the clearance under overhead lines and the slope of the route, and send us photos. We can also protect lawns and paving with track mats, and move spoil by skid steer or hand when the machine cannot reach.

A backyard addition, such as a room addition reached through a 4-foot gate, usually calls for a mini excavator and a small loader or wheelbarrow crew for spoil. Our mini excavator services page has more detail.

What happens before the pour?

Before concrete goes in, the footing trench is normally inspected for depth, width and bearing. We leave the trench clean and free of loose dirt, and hold it open until your builder or inspector signs off. Water in the trench, such as from a monsoon storm, is something your inspector will want to see handled before the pour.

Utility sleeves and plumbing under the footing are installed by the trades, and we coordinate our digging to fit their schedule. Locate requests go in at least two full working days before we dig, and the Arizona 811 guide explains the process.

What affects the cost of footing excavation?

Footing length and depth set the base. Caliche, rock, access, spoil haul-off, over-excavation and compaction testing add to it. A hand-trimmed trench in a backyard takes longer than a machine-cut trench on an open lot. We quote from plans where we can, and from photos and a site visit where we cannot.

Send the plan sheets showing the foundation, the soils report if you have one, and photos of the site and access. The dirt calculator will give you an estimate of the spoil volume, and you can start a request through the contact page or the bid request form.

What’s included

  • Digging to the surveyor's or builder's stakes
  • Footing trench trimmed to plan width and depth
  • Over-excavation and recompaction per the soils report
  • Caliche and rock removal at footing depth
  • Trench held open for the footing inspection
  • Spoil spread, stockpiled or hauled off

Questions we get about this

How deep does a footing have to be in Tucson?

The depth comes from your plans and the engineer, and the soils report may add conditions. It is not a single number for every lot. We dig to the plan depth from the stakes, and we stop and ask if the ground does not match the report.

Can you dig footings for a block wall or retaining wall?

Yes. Wall footings are dug to the plan width and depth, with the bottom trimmed level. Retaining walls often have steps or a keyway, so we shape those to the drawing. Send the wall details from the plans and photos of the area, and we plan the dig around them.

Who stakes the layout for the footings?

Normally the surveyor, builder or engineer sets the stakes and offsets. We dig to them. If stakes get knocked out, we ask for a restake before digging rather than guessing the line, because a footing in the wrong place is a costly fix.

What if it rains before the footing pour?

Water in a footing trench has to be handled before concrete goes in, and your inspector will want to see it. We can pump or clean out the trench and re-trim the bottom. During monsoon season, schedule the dig close to the pour to keep the trench dry.

Do you do the compaction testing?

No. Compaction testing is done by an independent testing firm that the owner or builder hires when the plans call for it. We compact the fill in lifts, coordinate with the tester on site, and redo any lift that fails.

Get a quote for footings & foundation digs

Tell us what you need and send a few photos. Photos of the route, the access and the ground let us price most jobs without a site visit.

Photos (optional · up to 3 · 7 MB total)
Best way to reach you

We use your details only to answer this request. See our privacy policy.