Trenching

Trenching Services in Tucson & Southern Arizona

We dig trenches for electric, water, sewer, gas, irrigation, telecom, solar and drainage lines, then bed, backfill and compact them so the ground stays put. Tell us the length, the depth and what is going in, and we pick the machine that fits the ground and the access.

A trench looks like a simple hole until you try to dig one in Tucson. Caliche shows up a foot down, sandy wash banks cave in, and the line you are burying has to end up at the right depth, with the right bedding, in a place a locator can find later.

We run mini excavators, backhoes, skid steers with trencher attachments and full-size excavators, so the machine matches the job instead of the other way around. This page covers the kinds of trenches we dig, how we choose equipment, and how a job runs from locate to cleanup.

What kinds of trenches do we dig?

Most of our trenching falls into a handful of categories. Each has its own depth, width and bedding needs, and each is installed by a different trade, which we coordinate with.

  • Electrical: service conduit, feeders to shops and casitas, RV pedestals, well pumps, gates and lighting. See electrical trenching.
  • Water, sewer and gas: service lines, well lines, sewer laterals, customer-owned gas yard lines and storm drains. See water, sewer and gas line trenching.
  • Solar and EV: long cable runs on acreage, inverter and battery feeds, and charger circuits. See solar and EV charger trenching.
  • Irrigation and drainage: mainlines, valve boxes, French drains and discharge lines.
  • Telecom and fiber: conduit for internet, cameras and gate controls.

We dig, bed, backfill and compact. The electrician pulls the wire, the plumber sets the pipe, and the installer connects the system. We schedule around them so a trench is never left open longer than it has to be.

Trencher, mini excavator or backhoe: which machine do you need?

A trencher attachment on a skid steer is the fastest way to cut a long, narrow trench in open, workable soil. It leaves a clean slot and a tidy spoil pile, which is why it suits irrigation, low-voltage and long cable runs on open lots.

A mini excavator is the better choice when access is tight, the trench turns corners, or the line has to pass close to a foundation or fence. Many compact machines fit through a gate a few feet wide, so a backyard reached through a side yard is usually workable.

A backhoe digs deeper and wider than a mini and travels on tires between nearby sites, which suits sewer and water work. A full-size excavator takes over for deep, wide or rocky trenches and for loading trucks. Our which machine tool gives a quick first answer, and the mini excavator and backhoe pages go into detail.

How deep and how wide should a trench be?

Depth is set by what goes in the ground and who regulates it. Electrical cover is governed by NEC Table 300.5, and the City of Tucson enforces the 2023 NEC. Our burial depth chart summarizes the common cases. Utility service laterals from TEP or Trico follow the utility's own spec, which is deeper than the NEC table, so we dig to the spec for your job.

Width is mostly a practical question. A trench needs room for the pipe or conduit, the bedding around it, and the compaction tool when the depth calls for it. Several lines sharing one trench need a wider cut than a single conduit, and the separation between utilities is set by each utility.

What does the trenching process look like?

Every job follows the same order, whether it is 40 feet or a quarter mile. The steps below are the ones that protect your lines, your neighbors' lines and your schedule.

  1. Scope and layout. You send photos, the route and the depth. We confirm the route on site and mark the dig area in white.
  2. Locates. The Arizona 811 request goes in at least two full working days before digging, and private lines get a private locator.
  3. Dig. We cut to depth, hand-exposing any marked line within 24 inches, and keep spoil and equipment at least 2 feet back from the edge.
  4. Bed and inspect. Sand or screened fill goes under and around the line, and the open trench stays available for your inspector.
  5. Backfill and compact. Fill goes back in lifts and is compacted so the trench does not settle into a groove.
  6. Cleanup. We spread or haul the extra spoil and leave the surface graded.

How do locates and private lines work in Arizona?

Arizona law requires a locate request through 811 or arizona811.com at least two full working days before digging, and marks stay valid for 15 working days. Excavators are required to white-line the dig area, with an exemption only for an owner digging on their own single-family property. Our Arizona 811 guide walks through the details.

The part people miss is that utilities do not mark private, customer-owned lines. The feed from the house to a detached garage, a well line, a gate operator circuit, yard lights and sprinklers all belong to the property owner. Those need a private locator, and we will tell you when a route crosses ground where one is worth the call.

What makes trenching in Southern Arizona different?

Caliche is the big one. It is a cemented soil layer that can turn a quick dig into a slow one, and it changes the machine we send. A rock teeth bucket, ripper tooth or hydraulic breaker may be needed, and the broken chunks cannot be used to surround a pipe. Read more in our caliche and rock excavation page and the caliche guide.

Sandy washes cave in quickly, so a trench near a wash may need to be sloped or shored. Trenches 5 feet deep or more need a protective system unless the ground is stable rock, and a competent person inspects the trench before work and after every rainstorm. Monsoon season runs June 15 to September 30, so open trenches near drainage paths are closed up before storms. The trench safety guide covers the rules.

What affects the cost of a trench?

Length and depth matter most, followed by ground conditions, access, and whether we are cutting through concrete or asphalt. Our trenching cost page explains each factor, and the trench calculator turns your length, width and depth into a cubic-yard estimate you can use for bedding and haul-off.

The fastest way to a firm quote is a few photos of the route, a rough length, the depth you need and what is going in the trench. When you are ready, use the contact page, or send plans through the bid request form for larger jobs.

What’s included

  • Arizona 811 locate request and white-lining
  • Machine matched to the soil and access
  • Hand-exposing marked lines within 24 inches
  • Sand or screened bedding around the line
  • Open trench left for your inspector
  • Backfill in lifts with compaction
  • Spoil spread or hauled and surface graded

Questions we get about this

How long can a trench stay open in Tucson?

As short a time as the schedule allows. We coordinate the electrician or plumber so the line goes in right after the dig, then backfill once any inspection is done. During monsoon season we close trenches near drainage paths before storms, because an open trench fills with runoff and its walls soften.

Do I need a permit to dig a trench?

It depends on what the trench serves and where you live. Electrical, plumbing and gas work usually carry their own permits pulled by the trade, and larger earthmoving can trigger dust or grading rules. Check with your city, town or county, and we will tell you what we have seen on similar jobs.

What if you hit rock or caliche halfway along the route?

We bring or switch to the tool that works, usually a ripper tooth, rock bucket or hydraulic breaker. Hard ground slows the work and adds machine time, so we tell you before the extra effort begins. A test dig on a long route shows what to expect before the job starts.

Who calls 811 for the trench?

We do. As the excavator we request the locate, white-line the dig area and keep the ticket on file. If your route crosses private lines such as a well or gate circuit, utilities will not mark them, so we recommend a private locator before we dig.

Get a quote for trenching services

Tell us what you need and send a few photos. Photos of the route, the access and the ground let us price most jobs without a site visit.