Tucson & Southern Arizona Residential & commercial ROC #312437 (KA) · ROC #329360 (KB-1) Call (520) 525-2755

Commercial work

Excavation for Municipal & Public Works Projects in Arizona

Public agencies buy through formal solicitations with specific bonding, insurance and prequalification rules. We read each one first, confirm what it requires, and bid only the excavation work the documents actually call for.

Public works buyers decide differently from private owners. The solicitation sets the process, the documents define the scope and the schedule is often tied to funding or a school year. A bid that is complete, correctly submitted and honest about its assumptions is worth more than a low number with gaps.

We bid excavation and site work on public projects in Tucson, Pima County and across Arizona, as a prime on small solicitations or as a subcontractor to a general contractor. The sections below explain how we handle the documents and the requirements.

What kinds of public projects do you bid?

Our fit is earthwork and site work: parks and recreation fields, school sites, drainage improvements, roadside ditch and culvert work, utility extensions, retention and detention basins, clearing and demolition of small structures and flatwork. Solicitations come from cities, towns, counties, school districts and special districts.

Our focus is the earthwork, trenching and site-utility side of a project rather than road, bridge or structure packages. We bid the dirt portion of a project, alone or as a subcontractor to a prime who needs an excavation sub. See excavation, grading and retention basins and ponds for how we approach core scopes.

How do you handle bonding, insurance and prequalification?

Before bidding, we read the solicitation for bid security, performance and payment security, insurance limits, license classifications, safety requirements and any prequalification form, and we confirm whether we can meet each one. If we cannot, we do not bid, and we tell a prime contractor early so they can find another sub.

Arizona requires an ROC license for contracting work, and the classification must match the scope. Excavating and grading work falls under classes such as A-5, R-2 or CR-2 "Excavating, Grading and Oil Surfacing", while pipe laying falls under A-12 "Sewers, Drains and Pipe Laying". Many agencies verify license classification before a bid is accepted, so the bid package should show the right one. We confirm the details for each project instead of assuming.

What about prevailing wages and Davis-Bacon?

Federally funded public projects can carry Davis-Bacon prevailing wage requirements, including weekly payroll reporting. That affects pricing, record keeping and how we staff the job. When a solicitation lists federal funding or wage determinations, we read them closely, price to them and keep payroll records the way the contract demands.

If you are a prime contractor, tell us in the invitation to bid whether prevailing wages apply and send the wage determination so we price from the same document you do.

How do public agencies regulate the dig itself?

Trench and excavation work on public projects follows OSHA 29 CFR 1926 Subpart P, enforced in Arizona by ADOSH, plus any agency standards in the specifications. Requirements include a ladder or ramp in trenches 4 feet or deeper and a protective system at 5 feet or deeper unless in stable rock. A competent person inspects before work, as conditions change and after rainstorms. See the trench safety rules.

Arizona 811 applies to public projects too. We request locates at least two full working days before digging, white-line the area and hand-expose lines within 24 inches of marks. Disturbing 1 acre or more can trigger the AZPDES Construction General Permit and a SWPPP, and larger earthmoving in Pima County can need an air quality activity permit. Specifications and the engineer will say who holds each permit.

How do you price and submit a public bid?

We price from the bid schedule, specifications and drawings, take off quantities independently and fill out the forms as written. We list addenda received, confirm the bid date and submit by the required method. Where the documents are unclear, we ask in writing through the channel the agency provides, so the answer applies to every bidder.

Send the solicitation number, the agency, the bid date and links or files via the bid request page. For prime contractors inviting us as a sub, our general contractors page describes how we work to your schedule and paperwork.

What do you do once selected?

We provide the submittals, schedules and records the contract calls for, work to the project's inspection process and keep the site tidy for the public. Public sites often have neighbors, school traffic and park users, so we plan fencing, dust control and staging with the agency's inspector. Changes go through the contract's change order process, with quantities and photos.

What’s included

  • Review of the solicitation, addenda and bid forms
  • Confirmation of bonding, insurance and license needs before bidding
  • Independent quantity takeoff from the drawings
  • Prevailing wage pricing where required
  • Arizona 811 tickets and trench safety planning
  • Documentation for change orders and pay applications

Questions we get about this

Can you tell me your bonding capacity?

We do not state capacity on this website. Each solicitation sets its own bid, performance and payment security requirements, and we confirm whether we can meet them before we bid. Contact us with the solicitation number and we will respond directly on that project's requirements.

Do you bid as a prime or as a subcontractor?

Both are possible. On smaller solicitations we may bid as the prime for earthwork scopes, and on larger projects we quote as a sub to the general contractor. Tell us which role you have in mind and send the documents, and we will confirm what fits.

Will you hold prevailing wage payroll records?

On projects with Davis-Bacon or other prevailing wage requirements, we price to the wage determination and keep the records the contract requires. Please send the wage determination with the bid documents so the pricing matches what the agency expects.

Can you work on school sites during the school year?

Yes, with planning. Agencies often restrict hours, access routes and noisy work when students are present. We read the project's restrictions, plan staging and fencing with the owner's representative and flag schedule risks in our proposal.

How do I send a public solicitation for you to review?

Use the bid request page and include the agency, solicitation number, bid due date, scope summary and either the documents or a link. The sooner we have the package, the better, because we need time to take off quantities and ask questions before the deadline.

Get a quote for municipal & public works

Tell us what you need and send a few photos. Photos of the route, the access and the ground let us price most jobs without a site visit.

Photos (optional · up to 3 · 7 MB total)
Best way to reach you

We use your details only to answer this request. See our privacy policy.