Grading & Site Work

Site Preparation in Tucson & Southern Arizona

Site preparation is everything that has to happen between a raw parcel and the day the framers or slab crew can start. We sequence the clearing, grading, pad and trench work so the other trades are not waiting on dirt.

A building site is a series of handoffs. Surveyors stake it, we clear and grade it, the geotechnical tester signs off the pad, the plumber and electrician set pipe and conduit and then the foundation crew arrives. When the sequence is wrong, someone digs a trench through a freshly compacted pad.

We work with homeowners, owner-builders and general contractors on residential and commercial sites. Here is how we usually organize the work and what we need from you at each step.

What order does site preparation follow?

The sequence below is typical, though every job shifts it. The key is that each step sets up the next and cannot be skipped without causing rework.

  1. Survey stakes and property corners set by a surveyor, with the building footprint located.
  2. Native plant notice, if protected plants are on the land (see below).
  3. Clearing and grubbing: vegetation, roots, rubbish and old structures removed.
  4. Rough grade to the stakes, stripping topsoil only where the plans call for it.
  5. Building pad built or over-excavated and recompacted to the soils report.
  6. Utility trenches for electric, water, sewer or septic, gas and communications.
  7. Driveway and access base, then final grading around the foundation once it is done.

Our pages on land clearing, grading, building pads and driveways and private roads go into each step.

Do I need to notify anyone before clearing native plants?

In Arizona, a landowner must notify the Arizona Department of Agriculture before destroying protected native plants, such as saguaros and many other cacti and native trees. The notice period is at least 20 days for under one acre, 30 days in writing for one to under 40 acres and 60 days in writing for 40 acres or more. Some already-built individually owned residential lots of 10 acres or less are exempt.

Moving protected plants off the land requires the state's permits and tags. Pima County, the City of Tucson, Oro Valley and Marana also have native plant preservation rules for development, which may involve a plan or permit. Build the notice period into your schedule, because it often decides when clearing can begin. Our native plant law guide lays out the timeline.

When do dust and stormwater rules apply?

Pima County requires an air quality activity permit for larger earthmoving, including land stripping or earthmoving over one acre. Separately, ADEQ's Arizona Pollutant Discharge Elimination System Construction General Permit and a stormwater pollution prevention plan apply when a project disturbs 1 acre or more, or less if it is part of a larger common plan.

These are usually the owner's or the general contractor's responsibility, and they affect what we do in the field: wetting the ground, limiting how much is open at once, keeping trackout off the street and protecting wash edges. If your site is near that line, tell us the total disturbed area when you ask for a quote.

How do you coordinate with the builder and other trades?

We ask for the schedule early. If the electrician's service trench and the plumber's sewer line must go in before the slab, we build the pad, trench with the trades and then return to finish the surface. On commercial work we can submit daily updates and take direction from the superintendent.

We dig, bed, backfill and compact trenches. The conduit, wire and pipe are installed by your electrician, plumber or septic installer, and we coordinate with each of them. For trenching specifics, see our trenching services and electrical trenching pages.

What affects the cost of site preparation?

Quotes follow the real conditions of the ground and the job, so a number from a distant phone call will not hold. The main factors are:

  • Area and vegetation: dense mesquite and cholla take longer than open ground.
  • Soil: caliche and rock require ripping or breaking.
  • Cut and fill balance, and whether material must be hauled in or off.
  • Compaction requirements and testing in the soils report.
  • Number of trenches and their depth, plus any surfaces to cut and restore.
  • Access, haul distance and the schedule the builder needs.

Send aerial or ground photos and the plans if you have them through our bid request form. For material quantities, our dirt calculator is a good first step.

How the job runs

  1. Review plans and photos

    We read the site plan, soils report and permits, then confirm scope and sequence.

  2. Clear and grub

    Vegetation, roots and debris are removed after any native plant notice has run.

  3. Rough grade and pad

    We cut, fill and compact the pad to the report and the builder's stakes.

  4. Trench and prepare access

    Utility trenches and the driveway base go in as the other trades need them.

  5. Finish and hand off

    We trim the final grade and leave the site ready for the foundation crew.

What’s included

  • Arizona 811 locate request and white-lining before any digging
  • Clearing, grubbing and rough grading to stakes or plans
  • Pad construction with compaction in lifts
  • Utility trench digging, bedding, backfill and compaction
  • Driveway base and access-road grading where in scope
  • Dust control on site by wetting where the job requires it

Questions we get about this

Can you manage the whole site preparation scope?

We handle the earthwork: clearing, grading, pads, trenches, driveway base and haul-off. Surveying, engineering, permits, concrete, plumbing and electrical stay with the appropriate professionals, and we coordinate with them. If you are an owner-builder, we can explain the order so you know who needs to be on site when.

Do I need a soils report before site prep?

Often yes. Many builders and jurisdictions require one, and it tells us how deep to over-excavate, what fill to use and what compaction to reach. If you do not have one, ask your builder or a geotechnical firm, and we will work to it.

What if there is a wash on my lot?

Washes can limit where you can grade and build. Work in or near a regulated wash or floodplain can need a floodplain use permit. We can reshape drainage around, but not inside, a wash without the right approval, so identify any wash before planning.

Can site prep happen during monsoon season?

It can, but storms can wash out open cuts and soak fill. We plan around the forecast, keep graded areas sloped to drain and avoid leaving a pad open during heavy weather. Wet fill cannot be compacted properly until it dries to the right moisture.

Do you clear trees and brush as part of site prep?

Yes. We clear brush, grub roots, remove stumps and haul off or mulch debris. Protected native plants have their own notice and permit requirements, so we check those first and do not remove protected plants until the owner confirms the paperwork is in place.

Get a quote for site preparation

Tell us what you need and send a few photos. Photos of the route, the access and the ground let us price most jobs without a site visit.

Photos (optional · up to 3 · 7 MB total)
Best way to reach you

We use your details only to answer this request. See our privacy policy.