Most grading problems show up months after the machine leaves, in the first summer storm. Water ponds against a slab, a driveway washes out at the low corner, or a fill settles into a dip. Good grading is mostly about where the water goes and how well the fill was placed.
We work from your plans, your builder's stakes or a walk of the property with you. Homeowners, owner-builders, general contractors and property managers all hire us for this, on jobs from a single backyard to a multi-acre site.
What is the difference between rough grading and finish grading?
Rough grading moves the bulk of the dirt. It cuts high spots, fills low ones, sets the overall slopes and brings the site to within a few inches of final elevations. It is done with excavators, loaders and larger skid steers, and it is where cut and fill quantities are won or lost.
Finish grading is the last pass. It trims the surface to the final grade for whatever goes on top: decomposed granite, landscape rock, pavers, turf, a concrete slab or an aggregate base. We use a skid steer or compact track loader with a landscape rake or a grading blade for this, because the accuracy comes from a light machine and a slow pass.
Many jobs need both, with other trades in between. On a new home the order usually runs rough grade, pad and trenches, then finish grade after the utilities are in. Our site preparation page walks through that sequence.
How much slope does a lot need to drain?
The model residential code (IRC R401.3) says the ground must fall at least 6 inches in the first 10 feet away from a foundation, where lot lines allow it. We use that as our starting point when we grade around a house, casita or garage, and we check it with a level or laser before we leave.
Where lot lines or walls make that fall impossible, the water needs somewhere else to go: a swale, a drain inlet or a pipe to daylight. That is a design decision, and our drainage solutions page covers the options. Grading plans and permit conditions come first, so if a plan sets your slopes, we follow the plan.
How do you balance cut and fill?
Hauling dirt off a site and trucking new dirt in are the two biggest avoidable costs in grading. When a lot has a high side and a low side, we try to move the high dirt to the low side and finish with the lowest possible import or export.
The catch is that dirt does not keep its volume. Cut material swells when it is dug and compacts when it is placed, so a plan that shows equal cut and fill rarely balances exactly in the field. Rock and caliche add another variable, because they do not break down into usable fill without processing. If you need an estimate of yardage, our dirt calculator turns square footage and depth into cubic yards.
When material does have to leave or arrive, we handle both through our hauling and material delivery service.
Why does compaction matter in Tucson soil?
Fill that is simply dumped and spread will settle, and in our desert basin it can settle hard when it gets wet. The Arizona Geological Survey describes collapsible soils that settle when wetted or loaded, expansive clays that swell and shrink, and earth fissures in the Tucson and Phoenix basins. That is why soils reports so often call for over-excavation and recompaction beneath anything that carries load.
We place structural fill in controlled lifts, condition it with water where needed and compact each lift before the next goes on. If your plans call for third-party compaction testing, we schedule our work around the tester. You can read how this applies under a structure on our building pads page.
Do I need a grading permit in Tucson?
Small jobs inside the City of Tucson can be exempt from a grading permit, but only if all of these are true: under 50 cubic yards of material, under 14,000 square feet of disturbed area, cuts and fills under 3 feet, slopes under 15 percent and no change to natural drainage. If any one of those is missed, a permit is likely.
Outside the city the rules depend on your jurisdiction. Pima County, Oro Valley, Marana and Sahuarita each have their own requirements, and Oro Valley, for example, can require a grading permit when 100 cubic yards or more is imported or stockpiled. Disturbing an acre or more can also trigger air quality and stormwater permits. We tell you which questions to ask your permitting office. We do not guess at the answer.
Grading near a wash may involve floodplain rules, so mention any wash on or beside your property when you contact us.
What should I prepare before grading starts?
- Stake or mark property lines and any corners we must not cross.
- Tell us about private lines: well lines, irrigation, gate power and yard lights. Utilities do not mark customer-owned lines.
- Provide your grading plan, soils report or builder's elevations, if you have them.
- Show us where water currently goes during storms, ideally with photos taken during rain.
- Measure the narrowest gate or opening so we can choose the right machine.
We request the Arizona 811 locate and white-line the work area before digging, as the law requires of excavators. Send photos and approximate dimensions through our contact page or the bid request form, and we will tell you what machine and approach we would use.
How the job runs
Send photos and plans
Photos, a rough sketch and any plans or soils report let us size the machine and the work.
Locate and mark
We call 811, white-line the area and confirm private lines with you.
Rough grade
We cut, fill and shape to the stakes or plan, placing fill in compacted lifts.
Utilities and other trades
Trenches, forms or footings are done, with us returning once they are complete.
Finish grade
A final pass sets the surface for rock, DG, pavers, turf or concrete, and drainage is checked.
What’s included
- Arizona 811 locate request and white-lining before work starts
- Rough grade, finish grade or both, as your plans or goals require
- Compaction in lifts where fill supports a slab, driveway or pad
- Final grade checked with a level or laser for positive drainage
- Cleanup of the work area and spoil placed where agreed
- Coordination with your builder, surveyor or compaction tester
Questions we get about this
How long does grading take?
It depends on the area, the amount of material to move and the ground. A small backyard regrade can be a short visit, while an acre-scale site takes longer and depends on weather and inspections. Send photos and dimensions, and we will describe the likely sequence and time once we see the site.
Can you grade around an existing house?
Yes. Compact skid steers and mini excavators fit through typical side gates, and we can often work in a yard without touching the structure. We protect slabs, block walls and utilities, and we locate private lines with you before digging so nothing is struck.
Do you grade for pavers or artificial turf?
Yes. Those surfaces need a compacted, smooth base set to a consistent slope. We finish grade to the elevation your landscaper or installer specifies, and we can place and compact the aggregate base when it is part of the scope.
What if my soils report calls for over-excavation?
We dig out the depth and width the report specifies, check the bottom with the geotechnical engineer or tester if required, then rebuild the pad with compacted fill in lifts. Following the report is how a slab or footing avoids settling later.
Does grading stop erosion on a slope?
Grading can reduce erosion by controlling the speed and path of water, but steep slopes often also need rock, vegetation or a retaining structure. We can reshape the ground and add rip-rap or swales, and we will tell you when a slope needs more than dirt work.