If you have lived in Tucson for any length of time, you have probably hit it. You dig a foot or two and the shovel rings off something that feels like concrete. That is caliche, and it affects drainage, trees, footings, pools and every trench you try to run.
We dig through it regularly. This page explains what it is, how it changes a job, which tools open it, and why broken caliche does not belong around a pipe.
What is caliche?
Caliche is a soil layer cemented by calcium carbonate. It forms in dry climates where minerals wash down through the soil and harden into a crust, and it can range from soft and chalky to rock-hard. Thickness varies from place to place, even on one lot.
You can often tell it is there by the way water behaves. The University of Arizona Cooperative Extension notes that if water stands more than 24 hours in a planting hole, caliche is a likely cause, and the fix is to break through it or drill drainage holes. Read their caliche quick guide, and our own caliche guide for practical details.
How does caliche affect your project?
- Drainage: a continuous layer can hold water above it, which affects yards, pads and trees.
- Trees and planting: roots stop at the layer and water collects in the hole. Breaking through is often the first step.
- Footings: the layer may sit at footing depth. Your engineer decides what to do with it. See foundation excavation.
- Pools: dig-outs through caliche take longer and may need a breaker. See pool removal for the reverse job.
- Trenching speed: the machine slows down, and the tool changes. See trenching.
The common factor is time. Caliche rarely changes what the job is, but it can change how long it takes and which machine does it, which is why we ask for photos and a test dig on long routes.
What tools open caliche and rock?
Soft caliche often yields to a rock bucket or a ripper tooth on an excavator or backhoe, which fractures the layer so the bucket can lift it. Harder layers and rock take a hydraulic breaker, which breaks the material by impact so the bucket can remove it.
For planting holes and drainage holes, an auger on a skid steer or mini excavator cuts through the layer cleanly. Larger machines handle wider cuts and heavier rock, while mini excavators work where access is tight. Our excavator services page covers the larger machines, and the equipment page lists the attachments.
Why can't you backfill pipe with broken caliche?
Broken caliche comes out in hard, angular chunks. NEC 300.5(F) says backfill with large rock or debris must not be used where it can damage conduit or cable, and the same sense applies to water and sewer pipe. Sharp chunks pressed against a line by compaction and settling can damage it over time.
That is why we bed pipe and conduit in sand or screened fill and keep the caliche out of the pipe zone. Caliche is useful in other places, such as a base layer under a driveway when your engineer allows it, but not against a line. See electrical trenching and utility trenching for bedding details.
How do we plan a job that may hit caliche?
We start with photos, the plans and anything you know about the lot, such as a neighbor's trench or a previous well. For long routes or footings, a test dig, a few holes at key points, shows what is under the surface before the main work starts.
Then we quote in a way that fits the uncertainty. Short, known jobs are priced as a lump sum. Long or unknown jobs carry a hard-ground allowance or an hourly rate for the breaker time, so you pay for what is actually there. The trenching cost page explains the options, and the dirt calculator sizes the haul-off.
Spoil from caliche is bulky, and it does not behave like soil, so we plan the haul-off or reuse in advance. In some cases it can be crushed and used as fill or base where your plans permit.
Can you break caliche for planting and drainage?
Yes. For trees, large shrubs and cacti, we break through the layer in the planting hole or auger a few drainage holes through it, so water can drain instead of collecting. Tell us the plant type and where the holes go, and we will size the work.
Check native plant rules before removing or moving protected plants, and call 811 before you dig. Our auger and post hole digging page covers the larger holes. To start a request, use the contact page.
What’s included
- Test dig to read the ground
- Rock bucket, ripper tooth or hydraulic breaker as needed
- Auger holes for planting and drainage
- Screened or imported bedding around pipe and conduit
- Haul-off or reuse of broken caliche
- Arizona 811 locate and white-lining
Questions we get about this
How do I know if I have caliche?
Typical signs are a layer that stops a shovel a foot or two down, a white or tan crust in the soil, and water that stands in a hole. The University of Arizona suggests suspecting caliche when water stays in a planting hole more than 24 hours. A test dig confirms it.
Can caliche be removed entirely?
Sometimes, within a limited area such as a trench, footing or pool. Removing it across a whole lot is rarely practical or necessary. Most jobs only need it broken through in specific places, with the rest left in place unless your engineer or the plans say otherwise.
Do you need a breaker for every caliche job?
No. Softer caliche often yields to a rock bucket or a ripper tooth. A hydraulic breaker is for harder layers and rock. We choose the tool after a test dig or a look at the site so we do not use more machine than the ground requires.
Does caliche make the job slower?
Usually yes. A trench that would take a short time in soft soil can take much longer in caliche, and the tool may change. We explain that up front, and for long routes we recommend a test dig so the schedule is based on what the ground actually does.
What do you do with the broken caliche?
It is hauled off or, where the plans allow, crushed and reused as base or fill away from pipes and structures. It is not used in the pipe zone or against a footing wall. We agree on the plan for the spoil before digging begins.