Tucson & Southern Arizona Residential & commercial ROC #312437 (KA) · ROC #329360 (KB-1) Call (520) 525-2755

Excavation

Septic System Excavation in Tucson & Pima County

We excavate for the septic system your designer drew and the county permitted: tank holes, leach trenches and beds, test pits and failed-field replacements. The designer and installer handle the system; we handle the digging.

A septic system is mostly an excavation project with plumbing in the middle. The tank sits in a hole to a set depth, the leach lines run in trenches to a set length, and the soil around them has to be undisturbed where the design says it must be. Get the dig wrong and the system may fail inspection.

Much of the Tucson area outside city sewer, including rural parts of Pima County, runs on septic. We dig for homeowners, owner-builders, designers and installers, and we work from the plans you have.

Who permits a septic system in Pima County?

Onsite wastewater permits in Pima County come from Pima County DEQ. A site evaluation and design come first, the permit follows, and inspections happen at set stages of the install. Check with the department for the current process and what it needs from you.

We do not design the system, and we do not apply for the permit. Your designer or installer does that. We dig to the approved drawing and keep the dig open for the inspections the permit requires. If conditions in the ground differ from the design, we stop and call the designer.

How do we dig a septic tank hole?

The tank hole is cut to the depth, length and width on the design, with a flat bottom on undisturbed or compacted ground so the tank sits level. The sides must be safe: a hole 5 feet deep or more needs sloping, shoring or a trench box unless the ground is stable rock, and spoil stays at least 2 feet from the edge.

The tank itself is set by the installer, usually with a crane or loader, and we backfill around it in lifts as the installer directs. In caliche, the tank hole takes a ripper tooth or breaker, and the bottom is finished so it is not rocky or uneven. See caliche and rock excavation.

How are leach trenches and beds dug?

Leach trenches are narrow, long and level, and the design sets their length, depth, spacing and bottom. Bottoms must be level and not smeared or compacted by the bucket, because smearing seals the soil that is supposed to absorb water. We use a toothed bucket and hand-finish where the design calls for it.

A bed is a wider, shallow excavation with a level bottom. In either case, we dig when the soil is workable, not wet, since wet soil smears. After the installer places the media and the lines, and the inspection passes, we backfill and grade so water drains away from the field. The utility trenching page covers the sewer line that runs from the house.

What are soil test pits and why do designers ask for them?

Designers need to see the soil to design a system. We dig test pits at the locations they mark, to the depth they specify, and leave them open for the designer or inspector to look at, with safe side slopes. After the evaluation, we backfill and compact the pit. Rock and caliche show up in a test pit before they show up in a trench, which is useful for pricing.

On acreage, the test pits can be far from the house. We bring the machine to the spot, dig and leave the area tidy. The Arizona 811 locate and a private locator for any well lines happen before we dig, as for any excavation.

Can you remove or abandon an old tank, or replace a failed field?

Yes, within the permit. Tank abandonment and removal are done under the county's rules, and we excavate the tank, help the installer or pumper with the removal and backfill the hole in compacted lifts so it does not collapse later. Ask the county what is required to abandon a system before we start.

A failed leach field is replaced with a new design in a new location or in the cleared old one, as the designer decides. We excavate the old trenches, handle the removed material as the permit directs, and dig the new field to the new drawing. Keep the area clear of vehicles and animals until the work is done.

What does septic excavation cost, and what should you send?

The size of the system, the depth, the soil, the distance across the property and the amount of rock set the price. Send the site plan or permit drawing, the tank size, the leach layout and photos of the route from the road. Our trenching cost page explains the general cost factors.

For a new build, the septic dig usually sits within a larger sequence; see new home site preparation. Start through the contact page, or review our excavation services first.

What’s included

  • Digging to the permitted design
  • Level, undisturbed bottoms for tanks and leach lines
  • Soil test pits for the designer
  • Trench from the house to the tank
  • Backfill in lifts and final grade
  • Coordination with your designer and installer

Questions we get about this

Do you design septic systems?

No. A septic designer evaluates the site and draws the system, and your installer builds it under a permit from Pima County DEQ. We excavate to the approved design and keep the dig ready for the required inspections. We work with whichever designer and installer you choose.

Can you dig the tank hole before the permit is approved?

No. Digging should wait for the permit and the approved drawing, so the tank hole and leach field match the design. Soil test pits for the designer are the exception, and they come before the permit. We work from the plan when it is ready.

Why does the leach trench bottom have to be level?

A level bottom lets effluent spread along the whole trench instead of collecting at one end. The design sets the depth, length and spacing. We cut to those figures and avoid smearing or compacting the bottom, which can seal the soil and cause the field to fail early.

Can you replace a failed leach field?

Yes, when your designer has a design and the permit is in place. We excavate the old field, haul material as the permit directs, and dig the new trenches or bed. The installer places the media and lines, and we backfill after inspection.

Can you get a machine to a septic site on acreage?

Usually. We have machines that travel on tires or tracks and can reach rural sites over unpaved access. Send photos of the road, any washes and gates, and the distance from the road. If the route is soft or crosses a wash, we plan the access before we mobilize.

Get a quote for septic system excavation

Tell us what you need and send a few photos. Photos of the route, the access and the ground let us price most jobs without a site visit.

Photos (optional · up to 3 · 7 MB total)
Best way to reach you

We use your details only to answer this request. See our privacy policy.