Trenching for Utility & Solar Contractors in Southern Arizona

Utility, telecom and solar crews need trench open to spec on the day the installers arrive, with locates done and existing lines exposed. We dig, bed, backfill and restore, and leave the pulling and splicing to you.

If you install conduit, cable or pipe for a living, trenching is the part of the job you want done right and done on time. A trench that is too shallow fails inspection. One that is too wide costs backfill. One that is not open when your crew is on site costs you a day of idle labor.

We work as the dirt crew behind your installers. Below is how we handle the points that matter to utility and solar contractors: specs, locates, crossings, bedding, restoration and schedule.

How do you trench to a utility's own spec?

TEP and Trico each publish their own requirements for service laterals, and those are deeper than the NEC table. We ask for the utility's design, the work order or the engineer's drawings, and dig to the spec for your job. We do not print depth numbers from memory, because the utility's current document governs.

For customer-side runs that follow the NEC, the cover depends on the wiring method and location: direct-burial cable, rigid or IMC conduit and PVC conduit each have different minimums, and runs under driveways and parking lots are deeper. Our burial depth chart summarizes NEC Table 300.5. The City of Tucson enforces the 2023 NEC.

Can you excavate duct banks and joint trench?

Yes. A joint trench carries electric, communications and sometimes other utilities in one cut, and a duct bank holds several conduits in a defined arrangement. Both need accurate width and depth, clean spoil management and a plan for what sits where. We dig to the drawings, prepare a bedding layer, and keep the trench open for your inspection or concrete encasement.

Separation between utilities is set by each utility. We follow the drawings and ask questions when they conflict. See utility trenching for water, sewer and gas, and electrical trenching for service conduit.

How do you work around existing underground lines?

Every dig starts with an Arizona 811 request at least two full working days ahead, plus white-lining of the proposed excavation. Marks last 15 working days, and we re-request before they expire. Within 24 inches of a marked line we expose it with hand tools, which keeps crossings safe and gives you a verified depth for the record.

Private lines, such as those from a house to a detached shop, are not marked by the utilities and need a private locator. Colors follow the uniform code: red for electric, yellow for gas, orange for communications, blue for water, green for sewer. The Arizona 811 guide explains the full process.

What about solar and EV cable trenches?

Ground-mount arrays need long, straight runs between strings, combiners, inverters and the point of interconnection, often across open desert with caliche and rock. We schedule the trenching to your EPC's sequence so the open trench does not sit through a storm, and we use a trencher or excavator depending on the ground and the width required.

In parking lots, EV charging runs are saw-cut, trenched, bedded, backfilled and restored, and burial under parking lots is deeper than in open ground. See solar and EV trenching for the full approach.

How are bedding, backfill and restoration handled?

Backfill containing large rock or debris must not be used where it can damage conduit, which is NEC 300.5(F). We bed with sand or screened fill, backfill in lifts and compact. Underground service conductors buried 18 inches or more, outside concrete, need a warning ribbon at least 12 inches above them under the NEC, and we place the ribbon your electrician supplies.

Where we cut concrete or asphalt, we restore to the surface the owner or jurisdiction requires. Public right-of-way work follows that agency's permit conditions. Trench depth and trench safety rules apply: protective systems at 5 feet or deeper unless in stable rock, and ladders at 4 feet. See trench safety rules.

How do you coordinate with your installers?

We want to know your inspection dates, pull dates and any hold points. We open trench in sections you can inspect, tell you when the line is clear for your crew, and close in step with your sign-off. Send route drawings, the utility work order or engineer's plans, and any permits through the bid request page, or use the contact page for smaller jobs.

What’s included

  • Arizona 811 tickets and white-lining
  • Trench to the utility's spec or your engineer's drawings
  • Hand-exposed crossings within 24 inches of marked lines
  • Sand or screened bedding and compacted backfill
  • Saw-cutting and restoration where required
  • Coordination with your inspection and pull schedule

Questions we get about this

Do you install the conduit or cable?

No. We dig the trench, bed it, backfill and compact. Your electrical, telecom or solar crew installs the conduit, cable, pull strings and fittings. We coordinate so the trench is open and inspected before we close it, and we leave the installation to the people who carry the licenses for it.

Can you provide the utility's spec requirements for a project?

No, the utility or your design engineer provides them. We dig to the document you give us, and we ask for the utility's current drawing or work order because specs change. If a requirement is unclear, we get clarification from you or the utility before cutting.

How do you handle trenches through caliche or rock?

We use a ripper tooth, hydraulic breaker or a trencher with rock teeth, depending on hardness and volume. Hard ground slows production, so we flag it during bidding if a geotechnical report or test dig shows it. Caliche chunks are not used as bedding around conduit.

Can you work on a joint-use trench with other trades?

Yes. We dig to the joint trench drawing and coordinate sequence with each trade so conduit is placed before backfill. Tell us the order your crews will install and we plan the open length and daily progress around it.

What do you need to quote a utility or solar trenching job?

Send the route plan or drawings, trench lengths and depths, utility spec or work order, pavement and surface types, site access and your schedule. Photos of the route help too. We confirm what is included and which items need verification in the field.

Get a quote for utility, telecom & solar contractors

Tell us what you need and send a few photos. Photos of the route, the access and the ground let us price most jobs without a site visit.

Photos (optional · up to 3 · 7 MB total)
Best way to reach you

We use your details only to answer this request. See our privacy policy.