What we need to bid accurately
- Civil, grading, utility and site plans, plus the geotechnical report
- Bid date, bid form and any alternates
- Phasing or schedule constraints and the site logistics plan
- Dust control, SWPPP and traffic control responsibilities
- Wage, bonding and insurance requirements for the contract
Use the bid request form to send everything at once.
On the job
We file the Arizona 811 tickets, keep a competent person on excavations, and use sloping, shoring or trench boxes wherever a trench reaches 5 feet. Larger disturbances bring a Pima County air quality permit and, at an acre or more, the ADEQ construction stormwater permit and SWPPP; we coordinate the best practices those require with the GC. Read trench safety rules for the numbers behind our setup.
Questions we get about this
Do you work as a subcontractor to general contractors?
Yes. Most of our commercial work is subcontracted earthwork, trenching and site utilities under a GC. We price from the plans, follow your schedule and site rules, and coordinate with the utility, the testing lab and the trades that follow us.
Can you take a scope that is only part of the site work?
Yes. We bid full site packages and individual scopes such as building pads, a utility trench, a basin, or operated equipment by the hour. Tell us what the bid package includes and we will price that scope cleanly.
Who handles compaction testing?
Compaction testing is done by an independent testing lab, usually hired by the owner or the GC. We schedule our lifts so the lab can test as we go, and we rework any area that does not meet the specification.
Do you bid public projects?
Yes, when the scope fits. Send the solicitation and we will review the requirements for bonding, insurance, prequalification and wages before we decide to bid. See our municipal and public works page for how those projects run.