A driveway that looks fine in May can be a gully by August. Most failures in the desert come from water: a crown that is too flat, a low spot with nowhere to drain or a wash crossing with no culvert.
We work for homeowners on short residential drives and for ranches, HOAs and property managers on longer private roads. The same ideas apply to both: a firm base, a crowned surface and a plan for where the water goes.
What goes into a good gravel or DG driveway?
A lasting driveway starts below the surface. We strip vegetation and soft soil, grade the subgrade to the shape you want, then place and compact a base layer. Decomposed granite or gravel goes on top, and each layer is compacted before the next.
Loose rock laid straight on soft dirt works for a season and then ruts. A compacted base prevents that, and the surface is shaped with a crown or a cross-slope so rain flows off sideways. Material is bought by the ton, so we convert your length and width to quantities. Our dirt calculator lets you check the number yourself.
How do you prepare a base for concrete, asphalt or pavers?
Paving contractors need a consistent, compacted, accurately graded surface. We provide the earthwork: stripping, subgrade compaction, ABC base placement and fine grading to the slopes the paving plan sets. We do not pour concrete or lay asphalt, but we coordinate with the crew that does.
For homeowners the main decision is the base thickness and the finished elevation. A driveway that ends higher than the garage slab can send water into the building, so we check how the surface will meet the garage and the street before we shape it. See our grading page for slope and drainage principles.
Do I need a permit for a driveway onto a public road?
A new driveway connection to a public road usually requires a right-of-way permit from the city, town or county that owns the road. Culverts, curb cuts and sight distance can be part of that review. Requirements vary by jurisdiction, so call your permitting office before work starts and ask what they need to see.
Grading a long drive can also trigger a grading permit, depending on the volume moved and the jurisdiction. Inside the City of Tucson, a small job is exempt only if it stays under 50 cubic yards, 14,000 square feet, 3 feet of cut or fill and 15 percent slope, and leaves natural drainage unchanged. Crossing a wash may involve a floodplain use permit.
How are washes and culverts handled?
Where a road crosses a wash, there are two basic options: a culvert that carries normal flow under the road, or a dip crossing that lets water run over a hardened surface. Which is appropriate depends on the wash, the flow and the rules in your jurisdiction. Work in or near a regulated wash can need a floodplain use permit from the Pima County Regional Flood Control District or, inside the city, the City of Tucson.
We excavate for culverts, set them on a compacted bed, backfill in lifts and armor the inlet and outlet with rock where it makes sense. The culvert pipe size and type come from your engineer or the jurisdiction. If the water is already undermining your road, send photos and tell us where it flows during storms.
Can a washboarded or rutted road be repaired?
Yes. Washboarding, potholes and ruts come from loose surface material and poor drainage. We rip or loosen the surface, add material where it is thin, reshape the crown and compact. Then we clear or cut roadside ditches and turnouts so water leaves the road before it gains speed.
After a monsoon washout, we reconstruct the lost sections, restore the base and add rock armor where the water cut through. If the same spot fails every year, the long-term fix is drainage, not more gravel. Our drainage solutions page covers that. For road work on larger parcels, see ranch and agricultural work.
How the job runs
Send photos and length
Photos, the approximate length and width and the access gate or entry help us scope the job.
Mark and locate
We call 811 and flag private lines, culverts or wash edges with you.
Prepare the subgrade
Soft soil is removed, the line is graded and the subgrade is compacted.
Place and compact base
Base and surface material go in by lift, shaped with a crown or cross-slope.
Drainage and finish
Ditches, turnouts and culverts are set, and the surface is raked and compacted.
What’s included
- Arizona 811 locate request and white-lining before digging
- Stripping and subgrade preparation, compacted before base goes in
- Base and surface material delivered, spread and compacted
- Crown, cross-slope or ditches to drain water off the surface
- Culvert excavation, bedding and backfill where in scope
- Cleanup and spoil removal if agreed
Questions we get about this
How thick should a gravel driveway be?
Thickness depends on the soil, the traffic and whether you add a base layer. A stable subgrade needs less than soft soil, and heavy trucks need more than passenger cars. We recommend a compacted base with a surface layer on top, and we size it to the load and your budget.
Is DG or gravel better for a desert driveway?
Each has trade-offs. Decomposed granite compacts into a firm, finer surface that looks natural but can erode in heavy flow. Crushed gravel is coarser and drains well but can be loose underfoot. A compacted ABC base under either gives the best result.
Can you fix a driveway that washes out every monsoon?
Usually, yes, but the fix starts with where the water comes from. We reshape the driveway to shed water sideways, add a ditch or culvert and place rock where flow is fastest. If runoff arrives from above your property, a swale or berm may be needed.
Do you build driveways for paving contractors?
Yes. We prepare the subgrade and ABC base to the grades and thickness the paving contractor or plan specifies, and we work around their schedule. We do not install the asphalt or concrete itself, so you will still need a paving crew.
How wide should a private road be?
That depends on how it will be used and on any rules from your fire district, HOA or jurisdiction. A single residence has different needs from a shared road with trucks or trailers. We can build to the width your plans or authority specify, or discuss practical options with you.