Solar and EV jobs are mostly electrical work, and most of the cost and delay sits in the trench. A ground-mount array a few hundred feet from the house needs a long, straight run. A charger in a detached garage needs a modest feed. A parking-lot charging bank needs saw-cutting, a trench and a clean patch.
We dig to the depth the electrician and the engineered plans call for, bed the conduit and restore the surface. The installer or electrical contractor supplies and pulls the conduit and wire; we schedule so their crew is not waiting on dirt.
What does a solar ground-mount trench involve?
Ground-mount arrays on acreage often sit well away from the house, which means a long trench from the array to the inverter, battery or main panel. The route needs to avoid washes, existing lines and mature trees, and the run has to hold the depth the electrician specifies for the whole length.
On open ground, a trencher attachment on a skid steer is fast and leaves a clean, narrow slot. In caliche or rocky soil, we switch to a mini excavator or backhoe, and bring a ripper tooth or breaker when needed. Long runs often cross a mix of soils, so a test dig along the route is worth the time.
The array's pier holes are a separate job handled by an auger; see auger and post hole digging. Our overview of trenching services covers the other trench types.
How do battery and inverter feeds work?
Battery and inverter feeds are usually short compared with the array run, but they often involve more than one conduit and a mix of power and communication lines. We cut the trench wide enough for the separation the electrician specifies and place the bedding for each line.
The wall or pad the equipment mounts to may need its own prep. If a pad is needed, tell us when you request the quote and we will include the grading and compaction in the plan. The electrician connects the equipment and the utility handles interconnection, so those steps run on their schedule, not ours.
How deep is a trench for an EV charger?
Minimum cover comes from NEC Table 300.5, enforced by the City of Tucson at the 2023 edition, and depends on the wiring method and what is on top. Under streets, roads, alleys, driveways and parking lots, the minimum is 24 inches for every method in the table. For one- and two-family dwelling driveways and parking, the minimum is 18 inches for cable and conduit. Residential 120-volt, 20-amp GFCI circuits have lower numbers, but most EV chargers use a higher-voltage circuit, so your electrician picks the method.
Our burial depth chart shows the common cases. If you are not sure what your charger needs, send the electrician's plan or the permit set and we dig to it.
What about EV chargers in parking lots?
Commercial charging is mostly a surface problem. We saw-cut the asphalt or concrete so the trench edges stay straight, break out and haul the pavement, and dig to the depth on the plans, which is 24 inches under parking lots by NEC Table 300.5. After the electrician installs conduit and passes inspection, we backfill and compact the trench in lifts so the patch does not sink.
Parking lots are also live. Customers, deliveries and neighbors still need access, so we phase the work to keep stalls and drive aisles open where we can and stage the trench in sections. The commercial page and the bid request form cover how we work from plans and bid packages, and the general contractors page lists the scopes we price.
How do we coordinate with your installer?
The installer or electrical contractor holds the permit, the equipment order and the utility interconnection. We hold the dirt. A common delay is a trench dug too early and left open while equipment is back-ordered, or a crew arriving before the route is cleared. We avoid both by agreeing on dates and trench length with the installer in advance.
We also ask the installer for the conduit size, the number of runs and the inspection plan before cutting. Those details set the width, the depth and how long the trench stays open. Send them with your photos and the route length, and we plan from there.
What affects the cost of solar and EV trenching?
Length and soil dominate. A long array run through open ground costs far less per foot than a short run through caliche, and every foot under a driveway or parking lot adds saw-cutting, haul-off and patching. Number of conduits, wash crossings and hand digging near existing lines add to the scope. The trenching cost page explains each factor.
Send photos of the route, the approximate length, the conduit count and the surfaces to cross. If the plans are ready, send those. The trench calculator gives you a cubic-yard figure for the spoil and bedding, and the contact page is the place to start.
How the job runs
Review the plans or route
We walk the route and check depth, conduit count and surfaces against the plan.
Locate and white-line
Arizona 811 and a private locator cover utility and customer-owned lines.
Saw-cut and dig
Pavement is cut and removed and the trench is dug to plan depth.
Conduit and inspection
The electrician installs conduit and the open trench is inspected.
Backfill and restore
Compacted backfill is placed in lifts and the surface is ready for patching.
What’s included
- Arizona 811 locate request and white-lining
- Trench to the depth on the electrician's plan
- Saw-cutting and removal of asphalt or concrete
- Bedding around conduit with sand or screened fill
- Open trench held for inspection
- Backfill in lifts with compaction
- Schedule coordinated with your installer
Questions we get about this
Can you trench for a ground-mount solar array on my acreage?
Yes. Long cable runs across open land are a common job. We scout the route for washes, trees and existing lines, choose a trencher, mini excavator or backhoe to match the soil, and dig to the depth on your plans. A test dig along the route helps if caliche or rock is likely.
How deep does the trench for a home EV charger need to be?
It depends on the wiring method and surface. Under a one- or two-family driveway the NEC table minimum is 18 inches for cable and conduit, while under a public street or parking lot it is 24 inches. Your electrician selects the method, and we dig to the plan.
Do you install the conduit and wire for the charger?
No. The electrician or solar installer supplies and installs conduit, fittings and wire. We dig the trench, bed it, and backfill and compact after inspection. We schedule with them so conduit goes in soon after we finish digging and the trench stays open only as long as needed.
Can you work in an active commercial parking lot?
Yes, in phases. We stage the saw-cutting and trench in sections so stalls and aisles stay open where possible, and we barricade the open work. Talk to us about hours and traffic patterns when you request the quote so we can plan around your customers and deliveries.
Who repairs the asphalt or concrete after the trench?
We backfill and compact the trench so the surface base is ready. The patch itself can be scoped with us or handled by a paving or concrete contractor of your choice. Tell us your preference when you request the quote so the restoration is priced and scheduled with the trench.
Do solar trenches need special inspection?
The electrical permit and inspection go through your installer or electrician, usually with the trench open before backfill. Ask them which agency applies for your address. We hold the trench open until the inspection passes, then backfill in lifts.